
Full Rake Indenting & Allocation
Managing statutory railway indents and securing priority train allocations.
Chartered full train load (FTL) rake movements for steel, cement, fertilizers, grain, and heavy industrial raw materials with direct siding-to-siding coordination.
Single consignment
Quayside rail transfer
Industrial & mining belts
Dedicated transit paths




















When your volumes justify it, a dedicated rake offers schedule control and unit economics single wagons cannot. We plan full train load movements from tendering to placement.
Commodity, rake composition and terminal handling are confirmed before commitment.

For massive industrial requirements, chartered train rakes deliver maximum throughput with unmatched economy of scale.
Arrowline plans full rake chartering, coordinates private industrial sidings at factory premises, and provides mechanized loading protocols to move thousands of tonnes in a single synchronized operation.

The movement types we coordinate under this service, subject to route and vehicle availability.

Managing statutory railway indents and securing priority train allocations.

Coordination at factory and port rail sidings for rapid mechanized loading and unloading.

Mechanized conveyor, tippler, and gantry crane loading for zero cargo loss.

Round-the-clock railway operations monitoring from departure to destination siding.
Real-world fleet operations, port handling, terminal staging, and heavy transport execution.
Dedicated full train load (rake) logistics for high-volume bulk commodities, minerals, cement, fertilizers, and industrial steel.
Single train movement replaces 80 to 100 highway trucks, slashing logistical complexity.
Optimal freight economics for high-volume industrial bulk materials.
Direct loading and unloading at private plant sidings with minimal double-handling.
In-depth knowledge of Indian Railways commercial freight tariffs, demurrage rules, and siding policies.
Managing loading labor, machinery, port permissions, and railway clearances.
Transport coordination across key business routes.
Planned corridors connecting ports, industrial hubs and city destinations — road, rail and coastal options on every major lane.
Four stages from the first requirement to delivery, each with the detail our desk works through.
Cargo, equipment type, pickup and delivery locations confirmed.
Route, vehicle configuration and transit window reviewed against your schedule.
Equipment placed, cargo secured and the movement coordinated to destination.
Delivery completed as agreed, with return handling coordinated where required.

Rake movements are coordinated between these port railheads, freight terminals and inland container depots.
Route and vehicle availability is confirmed for each requirement. Listing a location does not imply an Arrowline office or terminal there.

Based on 6 reviews
Based on 6 reviews
"Great service by the Arrowline dispatch team. Excellent communication and professional handling of our FTL cargo throughout the entire Mundra to Delhi corridor. Would strongly recommend."

Operations Manager
Adani Exports
Verified client
"Recovered my cargo delivery timeline after a shipping delay — good communication over the phone, arrived at the time that was agreed. Highly recommend. The team was professional and responsive."

Supply Chain Director
Tata Chemicals
Verified client
"Exceptional service and reliability. The team went above and beyond to ensure our shipment was delivered on time despite challenging circumstances during monsoon season."

Logistics Coordinator
JSW Steel
Verified client
"Arrowline handled our transportation requirements professionally. Communication was clear and the delivery process was smooth from pickup to final destination."

Procurement Manager
Renewable Energy Solutions
Verified client
"Reliable logistics partner with excellent coordination. Their team understood our requirements quickly and executed the shipment exactly as planned."

Plant Operations Head
Industrial Manufacturing Co.
Verified client
"Transitioning our raw material transport to Arrowline’s coastal shipping and road route saved us 32% in freight costs while maintaining consistent weekly factory supply."

Head of Logistics
Continental Ceramics & Minerals
Verified client

High-capacity scheduled rail freight services leveraging Western Dedicated Freight Corridors (WDFC) and Indian Railways networks for long-haul cargo.
Explore Service
Scheduled container train services connecting Mundra Port to inland container depots (ICDs) across North and Central India.
Explore Service
Synchronized rail, road, and port logistics combining the cost efficiency of long-haul rail with the precision of first-and-last-mile trucking.
Explore Service
Standardized containerized intermodal rail freight without cargo handling during transfer between ships, trains, and highway trucks.
Explore Service
Book a dedicated rake for high-volume container or bulk movements on your corridor.
Coverage, equipment, quotations and booking.
A Full Train Load (or full rake) is a complete dedicated train consisting of 40 to 45 rail wagons booked exclusively for one client's cargo, moving 2,500 to 3,500 metric tons directly between two railway sidings.
We utilize BOXN (open high-sided wagons for minerals/coal), BCN/BCNHL (covered waterproof wagons for cement, grain, fertilizers), and BRN/BFNS (flat wagons with stanchions for steel coils, plates, and long rails).
Indian Railways enforces strict loading/unloading free time (typically 5 to 9 hours depending on rake type). Arrowline deploys heavy-duty mechanization, loaders, and experienced supervision teams to guarantee zero demurrage penalties.
Yes. Point-to-point private siding movements provide maximum efficiency, moving cargo directly from a port or factory siding into the destination plant siding without intermediate handling.
Railway indents typically require 3 to 7 days advance placement depending on corridor congestion and wagon availability.